Company Brochure 2017

www.pcpltd.com What we Do • During the various stages of manufacture, the company quality control system ISO 9001:2015 ensures that our defined standards are maintained throughout. • Prior to dispatch, all control panels are subject to a full electrical/pneumatic functional test and final inspection, all test instrumentation is subject to certified calibration. Once completed a full documentation package is issued to our clients to include but not limited to: • OEM equipment data sheets • Software blocks • Schematic/arrangement diagrams • Cable block/interconnect diagrams • Test certification • Test and validation documents • CE Compliance and/or statement of compliance Clients are welcomed to our facility to witness test or carry out interim visits during build phase. Manufacturing , Production and Testing

RkJQdWJsaXNoZXIy NTYzMzA=